Service and Parts Manual
50 PB
INSTALLATION
Installation Work Flow
Preparation before installation
Prepare tools
Read the requirements 
for electric connection
select installation 
location
Select indoor unit 
installation location
Install wall-mounting 
frame, drill wall holes
Connect wires of indoor unit
Connect pipes of indoor 
unit and drainage pipe
Connect wires of outdoor unit
Bind up pipes and 
hang the indoor unit
Make the bound pipes pass 
through the wall hole and then
 connect outdoor unit
Neaten the pipes
Vacuum pumping and leakage detection
Check after installation and test operation
Finish installation
Select outdoor unit 
installation location
Install the support of outdoor unit
(select it according to the actual situation)
Connect pipes of outdoor unit
Install drainage joint of outdoor unit 
(only for cooling and heating unit)
 Start installation
Fix outdoor unit










