Installation Manual 24-36YJ

8
ENGLISH
INSTALLATION MAP
Vinyl tape (Wide)
• Apply after carrying out a
drainage test.
• To carry out the drainage
test, remove the air filters
and pour water into the heat
exchanger.
Saddle
Sleeve
Bushing-Sleeve
Putty(Gum Type Sealant)
Bend the pipe as closely
on the wall as possible,
but be careful that it
doesn't break.
Installation plate
Forced Operation Button
Air Discharge
Operation Indication Lamps/
Signal Receptor
Base Plate
Air Outlet
Air Inlet
Tubing Cover
Connecting cable (*)
Gas side piping
(*)
Liquid side piping
(*)
Additional drain pipe
(*)
Vinyl tape (Narrow)
(*)
Drain Hose
NOTE
!
• You should purchase the installation parts.
* The feature can be changed according to the type of model.