SPECIFICATIONS
Electrical Data
14
Electrical Wiring for 265 Volt
Models
NOTE:. It. is. recommended. that. the. PXSB. subb ase. asse mbly,.the.
PXCJA.c onduit.kit.(or.equivalent).be.installed.on.all.hardwire.
units...If.installing.a.
.mounted.u nit,.make.sure.the.
chassis. ca n. be. removed. from. the. sleeve. for. service. and.
maintenance.
WARNING
Electrical Shock Hazard
Turn off electrical power before service
or installation.
ALL electrical connections and wiring
MUST be installed by a qualified
electrician and conform to the National
Code and all local codes which have
jurisdiction.
Failure to do so can result in property
damage, personal injury and/or death.
Power Cord Installation
All.265V.PTAC/PTHP.units.come.with.a.factory.installed.non-LCDI.
power.cord.for.use.in.a.s ubbase..If.the.unit.is.to.be.hard-wired.refer.to.
the.instructions.below.
To install the line voltage power leads and conduit
to chassis, follow the instructions below and refer
to Figures 25-27 on page 19. PXCJA Conduit Kit
is required with this setup.
1. Follow. the. removal. process. of. the. chassis’s. junction. box..
(Figure.25,.step.2,.page.19).
2. .Prepare.the.265V.(or.230V).power.cord.for.conn ection.to.the.chas-
sis’.power.co rd.connector.by.cutting.the.cord.to.the.appropriate.
length.(refer.to.Figure.26.and.follow.Figure.15)...Power.cord.harness.
selection.shown.on.Table.2.on .page.14.
TABLE 2
MODEL HEATER kW Power Cord Kit Voltage Amperage Receptacle
PZE / PZH07K 3.0 STD 230/208 15 NEMA 6-20r
PZE / PZH09K 3.0 STD 230/208 20 NEMA 6-20r
PZE / PZH12K 3.0 STD 230/208 20 NEMA 6-20r
PZE / PZH15K 5.0 STD 230/208 30 NEMA 6-30r
PZE / PZH09R 3.0 STD 265 20 NEMA 7-20r
PZE / PZH12R 3.0 STD 265 20 NEMA 7-20r