Accessory VPASA1 Manual (2020)

VPASA1 KIT
Pg 12/16
95303000_02
Friedrich Air Conditioning Co.
10001 Reunion Place Suite 500/ San Antonio, Texas 78216
(210) 546-0500 / (800) 541-6645 / www.friedrich.com
Unpack new Friedrich Vert-I-Pak A-Series unit. Make sure the red drain plugs are in place prior to
installation. (See Figure 10A) Use 1/2" Ratchet to tighten the drain plugs if necessary.
Tip: See Vert-I-Pak A-Series Installation & Operation Manual for more information.
Tilt Vert-I-Pak down on pallet that came with the shipping as shown on Figure 10A.
Place 23” ID-side of adapter over backside of Vert-I-Pak. Line up adapter to the 2 bottom holes of
the Vert-I-Pak and mark each Vert-I-Pak screw that lines up with the 4 adapter slots. Place adapter
aside and remove the remaining (unmarked) 5 screws that do not align with the slots, and set them
aside in a secure place for later use. (See Figure 10B)
Slide adapter up into place, making sure that adapter hem is latched securely into cover flange. (See
Figure 10A-A)
Tip: If adapter placement is correct, the 5 screw holes should now align.
Place 23” ID-side of adapter over backside of Vert-I-Pak. Secure adapter flush to Vert-I-Pak by re-
installing the 5 screws into the now visible holes.
Tip: The bottom 2 holes will utilize #10 screws; the remaining 3 will use #8 screws
Remove the back Vert-I-Pak isolating foot (underside of unit, closest to adapter) by removing screws.
Once foot is removed, replace both screws back into unit.
Note: If the First Company® sleeve is flush with the inner wall, bend flange up 90°. (See Figure 10A-B)
Step 8: Install Vert-I-Pak Adapter