Installation guide

ROUGH-IN DIMENSIONS
75 Y_IN
(19177 CM)
54 5/16 IN
(13795 CM)
43 IN
(10922 CM)
i,
J
ELECTRICAL
CONNECTION O
WATER iNLETS _fO
(REAR)
I_ DRAIN OUTLET
f (REAR)
\__ 3Y_IN
(9 52CM)
hJ hJ
27 IN
(68 58CM)
GASSUPPLY
PiPE(REAR)
5Y41N l
_1333 CM)
43 IN
_( (1O922 eM)
104417_41NM)
29 7/16 iN
(7477 CM)
361/16iN
(9160 CM)
1
,
u u
I1_ 30 13/16 IN
(7826 CM)
Return laundry center to al, up, ,N, ,L position,
2YzlN
4t_ (6 35 CM)
1 7/8 iN
It-- (476 CM)
4 13/16 iN
(12 22 CM)
11 7/16 IN
(295 CM)
UNPACKING
1, Using the four shipping carton corner posts (two on each
side), carefully lay the laundry center on its left side and
remove foam shipping base.
2, Using ratchet with 3/8 inch (0,96 cm) socket, remove
mechanism shipping bolt and plastic spacer block from
center of base.
NOTE: If the laundry center is to be transported at a
later date, the tub blocking pad, shipping bolt, and
plastic spacer block should be retained.
PLASTICSPA(
4, Remove:
(a) roam tub blocking pad,
(b) roam shipping blocks from rear of unit.
(c) tape from dryer door.
(d) foam dryer support pads.
(e) inlet hoses.
(f) enclosure package,
5, From the back of the washer, remove the wire shipping
clips securing the drain hose and power cord (if equipped).
Plastic clamps secure the drain hose to the right side of the
washer backsheet, These clamps form a standpipe to
prevent water syphoning. DO NOT REMOVE THESE
CLAMPS.
6, Carefully move the laundry center to within 4 feet (1,22 m)
of the final location to begin the installation,
MECHANI!
SHIPPING
BOLT
G CARTON CORNER POSTS
FOAM
SHIPPING
PAD
:)OWER CORD
(IFEQUIPPED)
DSE
5