Installation guide

INSTALLATION
INSTRUCTIONS
Gas
connection
i
Remove
the
shipping
cap
from
gas
pipe
at
the
rear
of
the
dryer.
2
IMPORTANT
DO
NOT
connect
the
dryer
to
L.P.
gas
service
without
converting
the
gas
valve.
An
L.P.
conversion
kit
must
be
installed
by
a
qualified
gas
technician.
2
Connect
a
1/2
inch
(1.27
cm)
I.D.
semi-rigid
or
approved
pipe
from
gas
supply
line
to
the 3/8
inch
(0.96
cm)
pipe
located
on
the
back
of
the
dryer.
Use
a
1/2
inch
to
3/8
inch
(1.27
cm
to
0.96
cm)
reducer
for
the
connection.
Apply
an
approved
thread
sealer
that
is
resistant
to
the
corrosive
action
of
liquefied
gases
on
all
pipe
connections.
Manual
GAS
FLOW
Shutoff
Flare
nt
Flare
Valve
Union Union
Xe
Nigple
Open
inlet
Pipe
on
Back
of
Dryer
Flexible
Connector
All
connections
must
be
wrench-tightened
=a
IMPORTANT
The
supply
line
must
be
equipped
with
an
approved
manual
shutoff
valve.
This
valve
should
be
located
in
the
same
room
as
the
dryer
and
should
be
in
a
location
that
allows
ease
of
opening
and
closing.
Do
not
biock
access
to
the
gas
shutoff
valve.
3
Open
the
shutoff
valve
in
the
gas
supply
line
to
allow
gas
to
flow
through
the
pipe.
Wait
a
few
minutes
for
gas
to
move
through
the
gas
line.
Shutoff
Valve
-
%
Open
position
\.
vA
4
Check
for
gas
system
leaks
with
a
manometer.
If
a
manometer
is
not
available,
test
all
connections
by
brushing
on
a
soapy
water
solution.
44
WARNING
EXPLOSION
HAZARD
NEVER
test
for
gas
leaks
with
an
open
flame.
14