Installation Guide

READ BEFORE INSTALLING UNIT
BL Window Mounting (10,000 - 12,000 BTU)
1
Installation Instructions
Before installing, the top rail must be assembled on the unit.
Top Rail Hardware
Qty.
4
1
Top Rail
Drill (If pilot holes are needed)
7
1
Mounting Hardware Qty.
2
(For Vinyl-Clad windows)
NOTE:
the best way to store unit during winter, or when not
in use.
2
(For Wooden windows)
Top Rail
Fig. C
weather seals
5
window sash seal foam 1
be exposed:
Carefully read the installation manual before beginning.
INSTALLATION WARNINGS AND CAUTION
Fig. B
Carefully inspect location where air conditioner will be installed. Be sure it will support the weight of the unit over an extended
period of time.
The top rail on your unit may already be installed. If not,
follow the steps below.
66129926563

Summary of content (4 pages)