Manual

NOTE: For stand-alone installation, the base must be 4,
capable of supporting 100 Ibs. (45 kg). For a
combination Warm & Serve Drawer and built-in oven
installation, the base must be capable of supporting 250 5,
Ibs. (114 kg),
,
Remove the 2 locking plates and 6 screws included
in literature package. Mount the locking plates on
each s_de of cabinet c pening a_ong ns_ae of cutout
as ShOWn ,, _ gure 2 Center ROle mus[ De 7-5/8
(19.4 cm from cutout DO[[Om ro _neup w_tn holes
n wa/mer drawer housln J Use the 2 black screws [o
fasteR each lOCKing [ ate to the cabinet
Appro_mately
5/16 (.8cm)
7-5/8"
(19.4 cm)
Use 2 screws to
attach each locking plate
to each side of cabinet <l_Locking
plate
Figure 2
Slide drawer into cutout opening until front frame of
drawer is flush against cabinet. Be careful not to
[)inch electrical cord,
Open drawer and secure housing to locking plates
using the 2 nickel-plated screws supplied, Drive
screws from inside drawer into middle hole in each
locking plate (see Figure 3). De not overtighten
screws.
attach Iocldngplates_ _- ! : .,
to draw_ housing .
Figure 3
,
7,
The 60" (152 cm) appliance power cord can now be
connected into the 120 Volt outlet,
Proceed with mounting built-in oven above the
drawer (if applicable), Follow installation instructions
provided with built-in oven. Make sure to use anti-tip
brackets supplied with the built-in oven.
NOTE: Use a piece of cardboard to protect warmer
drawer frame and prevent scratching when installing
wall oven over warmer drawer,
11