Manual

NOTE: For stand-alone installation, the base must be 4.
capable of supporting 100 Ibs. (45 kg). For a
combination Warm & Serve Drawer and bulk-in oven
installation, the base must be capable of supporting 250 5.
Ibs. (114 kg).
3.
Remove the 2 locking plates and 6 screws included
in literature package. Mount the locking plates on
each side of cabinet opening, along inside of cutout,
as shown in Figure 2. Center hole must be 7-5/8"
(19,4 cm) from cutout bottom to line up with holes
in warmer drawer housing. Use the 2 black screws to
fasten each locking plate to the cabinet.
7-5/8"
(19.4 cm)
Figure 2
Slide drawer into cutout opening until front frame of
drawer is flush against cabinet. Be careful not to
pinch electrical cord.
Open drawer and secure housing to locking plates
using the 2 nickel-plated screws supplied. Drive
screws from inside drawer into middle hole in each
locking plate (see Figure 3). Do not overtighten
screws.
Figure 3
6.
7.
The 60" (152 cm) appliance power cord can now be
connected into the 120 Volt outlet.
Proceed with mounting builtqn oven above the
drawer (if applicable). Follow installation instructions
provided with builtqn oven. Make sure to use anti4ip
brackets supplied with the builtqn oven.
NOTE: Use a piece of cardboard to protect warmer
drawer frame and prevent scratching when installing
walt oven over warmer drawer.
11