Instruction Manual

5 Initial start-up
After the PULVERISETTE 15 has been set up as described in
Ä
‘Installa‐
tion’ on page 17 and the mains plug has been plugged into the mains
socket, the device is ready for operation.
Check whether the rotor can turn freely before switching on for the first
time. To do so, open the closing lid and turn the rotor one complete
rotation by hand with the upper part closed. If the rotor can turn freely,
the closing lid can be closed again. If not, check the cutting gap. (See
Ä
‘Checking the gap width’ on page 23).
5.1 Switching on
Set the main switch to ON (I). The cutting mill starts running.
5.2 Switching off
Set the main switch to OFF (0). The cutting mill stops within approx. 10 -
15 seconds.
Initial start-up
- 20 -