Installation Guide

COMPOSITE DOOR FRAME
INSTALLATION INSTRUCTIONS
Contents:
83” left side frame with weather seal
83” right side frame with weather seal
36” top frame with weather seal
Other Components Required:
Composite Brickmould kit
Interior casing kit
Shims
(6) #8 x1-5/8” screws to fasten frame together
(10) #10 x3” screws to fasten frame to rough
opening
Tools Required
Tape measure
Safety glasses
Power drill/driver
Power chop saw or miter box
Framing square
Level
Installation Instructions
STEP 1: Measure the rough opening.
STEP 2: Trim the frame to t around the door slab
being used (about 1/8 in. gap) and also to t in the
rough opening (about 1/2 in. gap.) The thick part
on the bottom of the side frame is factory cut at 5
degrees to t most sills. The top of the side is notched
to t the top frame. Trim the bottoms to t the sill
being used and to t the height. Cut the top frame
1-1/2 in. smaller than the nal frame width needed
STEP 3: Screw each side frame to the top frame with
(3) #8 x 1-5/8 in. screws.
STEP 4: Set the frame assembly in the rough opening.
Shim the frame in place at 5 locations on each side
and 1 on the head. Ensure it is plumb, level and
square.
STEP 5: Fasten the frame to the rough opening with
#10 x 3 in. screws through the side frames and head
at each shim location underneath the weather seal.
STEP 6: Install the Composite Brickmould kit on the
exterior of the door frame.
STEP 7: Install interior trim on the interior of the door
frame.
SH/CDF/II1000/0719PTP©2019 FrontLine Bldg. Products Inc.
www.frontlinebldg.com | sales@frontlinebldg.com | 920-393-1340
STEP 8: Install hinges and lock plates as needed for
the door being hung on the frame. Route the frame
to t the hinges and lock plates selected.
STEP 9: For primed and woodgrain composite
jambs, nish the surface of the frames within 15 days
of installation to prevent the factory primer from
breaking down. Woodgrain has a tan primer on it to
accept stain, clear coat, or paint.
STEP 10: Seal with high quality caulk: inside top
corners, bottom corners to sill, brickmould to siding,
and brickmould to frame.

Summary of content (1 pages)