Operating Manual

INOVA DAS Operating Manual
92
4.3 ROU 5W Installation
4.3.1 Product Installation
ROU 5W is configured with one enclosure, installation on wall is available through mounting
bracket.
Figure 7. ROU 5W Needed Door Space.
Since ROU 5W is, same as ROU 2W, configured with door, for ease of process, 324mm space on
the equipment right side must be secured, and more than 570mm installation space is needed
from installation wall.
Figure 8. ROU 5W Anchor Bolt Assemble.
Above figure is a simple drawing of the wall face. For wall face installation of ROU 5W, anchor