User's Manual Part 1

3-16 Saja Operation Manual
10/12/00
Daily Operations Chapter3.fm
5. While holding the pins on left side of the BTR roller, pull it towards you
and lift it out.
6. Hold the new BTR roller with the pin on the left side. First, insert the
shaft into the right bearing. Then, insert the left shaft.
Important: Make sure the shaft is seated firmly in the bearing