Server User Manual

Note -
In the case of a dual power feed, connect the power cords in their original positions by
referring to the record that you made before the start of maintenance.
XSCF>
testsb -a
8.7.3 System-stopped maintenance
1.
Connect all the power cords to the PSU backplane unit of the chassis
requiring maintenance.
For details, see "6.5.1 Installing the power cord."
2.
Start the system.
For details, see "6.4.1 Starting the system with an XSCF command"or"6.4.2
Starting the system from the operation panel."
3.
Execute the testsb command to confirm that the memory requiring maintenance
is recognized.
4.
Close the rack door.
Fujitsu M10-4/Fujitsu M10-4S/SPARC M 10-4/SPARC M10-4S Service Manual
December 2013178