Installation guide

36 Operating Manual RX300 S7
Important information
Before starting up
V CAUTION!
During installation and before operating the device, observe the
instructions on environmental conditions for your device (see
"Ambient conditions" on page 30).
If the server has been moved from a cold environment, condensation
may form both inside and on the outside of the machine.
Wait until the server has acclimatized to room temperature and is
absolutely dry before starting it up. Material damage may be caused
to the server if this requirement is not met.
Only transport the server in the original packaging or in packaging
that protects it from impacts and jolts.
Installation and operation
V CAUTION!
This unit should not be operated in ambient temperatures above
35 °C.
If the unit is integrated into an installation that draws power from an
industrial power supply network with an IEC309 connector, the power
supply's fuse protection must comply with the requirements for non-
industrial power supply networks for type A connectors.
The unit automatically adjusts itself to a mains voltage in a range of
100 V - 240 V. Ensure that the local mains voltage lies within these
limits.
This device must only be connected to properly grounded power
outlets or insulated sockets of the rack's internal power supply with
tested and approved power cords.
Ensure that the device is connected to a properly grounded power
outlet close to the device.