Installation Instructions

EN
10
STEP 9
After completing the electrical and gas connections (see
included instructions) measure the four corners in cutout area
to verify if flooring is level. Adjust the leveling legs to the desired
height and ensure range is level. Turn the bottom section of
each leg counter-clockwise to raise the leg and clockwise to
lower it.
Ensure floor is protected. Slide unit into place making sure to
engage the anti-tip bracket.
STEP 10
Hook tabs on bottom of toekick into slots on either side of the
frame and rotate up until the magnets at the top of toekick
make contact and hold it in place securely
4 - Installation Instructions