Installation Instructions

EN
8
STEP 5
Pull out the hand-truck, tilt the range laterally and insert the
second pair of legs. Remove the base
STEP 6
Install the backsplash (if provided) by the three screws on the
back and the toe kick
9”
3”
STEP 7
After the electrical and gas connections (see both paragraphs
for instructions) measure the four corners in cutout area to verify
if flooring is level. Adjust the leveling legs to the desired height
and ensure range is level. Turn the bottom section of each leg
counter-clockwise to raise the leg and clock wise to lower it.
Ensure floor is protected. Slide unit into place making sure to
engage the anti-tip bracket.
STEP 8
Hook tabs on bottom of toekick into slots on either side of
the frame and rotate up until clips at top of toekick engage
securely.
NOTE: Be sure the toekick snaps securely.
4 - Installation Instructions