For more information contact our team: service.ec@foagroup.
Do not fully tighten all bolts until steps 9. Prepare 4 bolts assembly by inserting washer (#C) onto bolts (#A). Align upper back rails (#4) and upper front rail (#3) to the holes of the right panel (#2). Secure with bolts (#A). 1) Prepare 2 bolts assembly by inserting washer (#C) onto bolts (#A). Align middle front rail (#5) to the hole of the bottom front rail (#7), then secure with bolts (#A). 2) Align middle back rails (#6) to the hole of the bottom back rail (#8), then secure with bolts (#A).
2) Align middle and bottom back rails to the holes facing back of the right panel (#2). 1) Prepare 4 bolts assembly by inserting washer (#C) onto boles (#A). Align middle and bottom front rails to the holes facing front of right panel (#2). Prepare 2 bolts assembly by inserting washer (#C) onto bolts (#A). Align panel 1 (#9) to the holes of the right panel, then secure with bolts (#A).
Prepare 2 bolts assembly by inserting washer (#C) onto bolts (#A). Align panel 1 (#9) to the holes of the right panel, then secure with bolts (#A). Prepare 10 bolts assembly by inserting washer (#C) onto bolts (#A). Align left panel (#1) to the rest of the shelf and secure with bolts (#A).
Align short panels (#11) to the holes of the shelves as shown in the picture. Secure with bolts (#B). Align long panels (#10) to the shelves, then secure with bolts (#B).
Attach and adjust adjustable floor protectors according to ground level. Fully tighten all bolts Tipping restraint optional. Align iron connector (#G). to top of shelf, then secure with screws (#E).
Create your own hole and screw iron connector (#G) to the wall with screws (#F).