Users Manual Part 6

2. WIRING
2-66
2. Remove the appropriate spacer to pass the cable for Control Unit on the lower
plate. The recommended cable entrance is shown as below.
3. Fasten the cable to the post part of the plate
with a cable tie (local supply).
Note: Be sure the vinyl sheath on the post.
4. Pass the cables to the TB board 03P9648 and clamp the shield of the cable with
the cable clamp (A) shown in the following figure. Then, connect to J611 and J612.
Connection of cable of LAN, Monitor Unit, VDR
Connect the cables of Intelligent HUB (HUB-3000) and Switching HUB (HUB-100) to
the LAN ports in front of the Processor Unit.
Connect the cables of Monitor unit or VDR to the DVI ports at the front of the Processor
Unit.
Lower
plate
Control Unit
Control unit cable
Lower plate
03P9648
J611 (10 lines)
Control unit cable
J612 (2 lines)
㻷㻱㼅㻮㻻㻭㻾㻰
Clamp the shield.
(
A
)
DVI-I port (for analog signal) DVI-D port (for digital signal)
LAN1 port
(for HUB-3000)
LAN2 port
(for HUB-100)