Installation Instructions

Consumer Installation Sheet
PRE-INSTALLATION
INSTALLATION
Step 3 - Joints & Cuts.
When installing multiple rolls wall-to-wall, consumers can:
a. Overlap rolls (1½” to 6”)
—OR—
b. Butt Joints - Trim edges to continue floor pattern by forming a
tight butt joint between rolls. Follow guidelines for butt-type joints.
Step 2 - Unroll Floor.
Position G-Floor® at front of garage, one roll at a time. Roll ooring out
front to back and position carefully.
Use a broom to push out any air underneath G-Floor.
Step 1 - Clean Floor.
Make sure garage oor is clean, dry, and free of any objects. Sweep
dirt out of garage and remove any lumps or excess cement/debris that
might cause a bump on the surface.
Measure oor to order proper amount of ooring.
Measure the oor.
Roll out ooring front-to-back.
Clean oor before applying ooring.
Push out any air with a broom.
Overlap Joint Butt Joint
Butt-type seaming guidelines.
Fold back edge of roll #1 and wipe clean. Attach tape along roll #1’s
edge (leaving 2” of tape exposed) and fold back into position.
Fold back roll #2 and wipe bottom edge clean. Carefully align along
edge of roll #1. Do not stretch mat or tape when applying.

Summary of content (2 pages)