Instructions / Assembly
Care & Preventative
Maintenance
HydroStop® PremiumCoat® Liquid-Applied Roong (LAR) – Version 1.3
47
INSPECTION CHECKLIST
Pre-Inspecon
1. Prior to the actual roof inspecon, a detailed roof plan should be prepared, on which any
defects and notes can be recorded.
2. Prior to going onto the roof itself, inspect the underside of the deck (if accessible), as well
as the outside of the building. Note any signs of excessive moisture or deterioraon. These
observaons can give clues to not only problems with the roof, but also other condions
aecng the performance of the building envelope.
GAF Inspecon Checklist
Area of Concern Treatment
ü
Roof Membrane & Flashings
•
Ensure that the overall roof coang membrane is sound and free
of mechanical damage, splits, crazing, and cracking. In areas prone
to standing water, inspect the coang surface for signs of blisters,
delaminaon, or degradaon caused by biological growth.
Roof Drains & Scuppers
•
Ensure that roof drains and scuppers are clear and free of all debris to
allow for proper drainage. Check drain covers to verify that they are
ght and properly fastened. Ensure that the coang around drains and
scuppers is sound and free of blisters, tears, and delaminaons.
Parapet Walls & Caps
•
Inspect interface between roof deck and parapet walls to ensure that
there are no splits or tears, and that the coang membrane is fully-
adhered and sound. Examine parapet walls and caps to ensure that there
are no cracks or breaks in the substrate or membrane that will allow
moisture to enter beneath the coang system.
Protrusions
•
Inspect the reinforced coang around all protrusions, such as vent pipes,
for any signs of splits, tears or delaminaons around the base. Ensure that
vent pipes have the proper caps installed. Inspect coang to ensure that it
is sll self-ashing and secure around the top of all protrusions.
Roof Mounted Equipment
•
All rooop equipment should be inspected to ensure that it is well-
secured to the base risers, and that the coang and reinforcement around
the base is sound and free of blisters, tears and delaminaons.
Skylights
•
Check the reinforcement around all skylights to ensure that it is sound and
free of blisters, tears and delaminaons.
Other Details
•
Check the bricks and mortar on chimneys, as well as caulking or joints in
metal ashings such as copings, counter-ashings, rooop units, curbs,
caps, expansion joints, etc. Repair or replace caulking as necessary.
Moisture Analysis (oponal)
•
If damage has caused concern with moisture penetraon into the roof
substrate, a non- destrucve moisture detecon survey can be conducted
to provide an accurate analysis. Two common methods are nuclear
metering and infrared thermography. A moisture meter probe can also be
inserted through the coang; however, this is a destrucve method and
will require the damage be repaired.
Minor Repairs
•
Areas found to need minor repairs (e.g., small punctures and tears) during
the inspecon may be repaired with Roof Mate Buer Grade. More
extensive repairs may be treated with Roof Mate Buer Grade product
with fabric. For project-specic recommendaons, please contact GAF’s
Technical Services.