Installation Guide

IMPORTANT: Observe all governing codes and ordinances. Do not
INSTALLATION REQUIREMENTS
Thank you for purchas ing a Galanz produc t. P leas e read this manual c arefully for c orrec t usage and s afety,
and keep for future reference. For s ervice, s upport and warranty information, call 800- 562- 0738.
FPO
INSTALLATION REQUIREMENTS
©2019 Galanz Americas Limited Company
nce,
using
rom
ted
ore
e
e
n it is
at
e for
cturing
ng.
moke
5
Gas Supply Line Kit (Supply Line and 2 adapters)
LOCATION REQUIREMENTS
VENTILATION
It is the installer’s responsibility to comply with installation
clesrances specified on the model/serial rating plate. The
model/serial rating plate is located on the left-hand side of the
oven frame. Open oven door to view label. See label on back
panel of range for additional element and oven power ratings.
IMPORTANT: This oven has been designed in accordance with the
requirements of UL and CSA International and complies with the
maximum allowable wood cabinet temperatures of 194F (90°C)
TEMPERATURE
Some cabinet and building materials are not designed to withstand
the heat produced by the oven for baking and self-cleaning. Check
with your builder or cabinet supplier to make sure that the materials
used will not discolor, delaminate or sustain other damage.
Contact a qualified floor covering installer to check that the floor
covering can withstand at least 200℉ (93℃).
Do not install range over carpeting.
GENERAL
The range should be located for conveninet use in the kitchen.
Recessed installations must provide complete enclosure of the sides
and rear of the range.
To eliminate the risk of burns or fire by reaching over heated surface
units, cabinet storage is to bo provded, the risk can be reduced by
installing a range hood or microwave hood combination that projects
horizontally a minimum of 5" (12.7 cm) beyond the bottom of the
cabinets.
All openings in the wall or floor where range is to be installed must be
sealed.
Do not seal the range to the side cabinets.
Grounded electrical supply is required. See “Gas Supply
Requirements” section.
Rating Plate
A
A