User's Manual
Table Of Contents
- 1. INTRODUCTION
- 2. General Information
- 3. Mounting
- 3.1 Definition of the Door Hinge (Right or Left Door)
- 3.2 Metallic and Non-Metallic Doors
- 3.3 Dimension Diagrams for Mounting
- 3.4 Door Status Contact
- 3.5 Mounting in Lockers with Non-Metallic Doors
- 3.6 Mounting in Lockers with Metallic Doors
- 3.7 Points to be observed during Installation
- 3.8 Test Installation
- 3.9 Replacement after a Burglary Attempt
- 3.10 Installation of the GAT NET.Controller M/S 7000
- 4. Electrical Connection
- 5. Configuration And Operation
- 5.1 Antenna Adjustment of the GAT NET.Lock 7000
- 5.2 Locker Operation by the Visitor
- 5.3 Restart a Controller GAT NET.Controller S 7000 or GAT NET.Controller M 7000
- 5.4 Delete Configuration Parameters of a Controller (= Reset to Default Settings)
- 5.5 Status Information for the GAT NET.Controller S 7000 and GAT NET.Controller M 7000
- 5.6 GAT Relaxx - Operation Software for GAT NET.Lock 7000 System
- 6. Technical Data
GAT NET.Lock 7000 System
Mounting
20
HB_GAT-NETLOCK7000--US_33
www.gantner.com
3.6 Mounting in Lockers with Metallic Doors
In lockers with metallic doors the GAT NET.Lock 7000 is mounted on the left or right inner locker wall (depending if
it is a right or left locker). 2 cut-outs have to be made in the door - one on the inside door sheet and one on the out-
side door sheet. The two parts of the GAT NET.Lock Bolt Set 7200 are then mounted into the locker door. See the
following figure and the steps afterwards for the mounting instructions.
1. GAT NET.Lock 7000
2. GAT NET.Lock BoltSet 7200
3. Mounting screws for the GAT NET.Lock 7000
4. Door shackle
5. Door contact
6. Mounting screws for bolt set (pan-head metal Torx Ø 3.5 x 9.5 mm)
7. LED position
8. Cut-out for GAT NET.Lock BoltSet 7200
9. Cut-out for label carrier
10. Label carrier
Figure 3.7 - Mounting of the GAT NET.Lock 7000 in a locker with metallic doors (right door)