Electrical Connections
30
HB_GAT-ACCESS6100--EN_12
www.gantner.com
3.4 Checklist for Final Installation
After installation and configuration fill-out the following checklist to ensure that every necessary step has been
performed and the GAT Access 6100 is ready to be put into operation.
Note: Some points in the Installation section are not necessary for the GAT Access 6100 Enrollment Station.
Installation:
Cable between device back part and upper part connected on both sides
Housing closed and sealed
Power supply connected
Interface connected
Host/server is running (for online mode)
RFID Reader tested (hold data carrier to scan field)
Configuration (see chapter "7. Configuration"):
Latest software is installed in the GAT Access 6100
Network parameters set (IP address, network name, subnet mask, DNS)
Time of GAT Access 6100 set correctly
Functional settings set (see chapter "4.3. Configuration Settings" and "GAT Config Manager" manual)
Site-key of the GAT Access 6100 is set correctly