User's Manual
Table Of Contents
- 1. General
- 2. Mounting the GAT Access 6100 Terminals
- 3. Electrical Connections
- 4. Start-up and Configuration
- 5. Operation
- 5.1 Control and Display Elements
- 5.2 General
- 5.3 User Operation at a GAT Access 6100
- 5.4 User Operation at a GAT Access 6100 F BIO
- 5.5 User Operation at a GAT Access 6100 F Enrollment Station
- 5.6 Standard Operation for the GAT TimeAxx 6150 with Countdown Functionality
- 5.7 Online Mode and Emergency Mode
- 5.8 Out of Order Screen
- 5.9 Locker Check-In
- 5.10 General Open Function (Group Entry)
- 5.11 External Release Function
- 6. Communication
- 7. Updating the GAT ACCESS 6100
- 8. Troubleshooting and FAQ
- 8.1 How can I update the firmware of a GAT Access 6100?
- 8.2 How do I configure a GAT Access 6100?
- 8.3 Which TCP/IP ports can be used by a GAT Access 6100?
- 8.4 Which bit rates are used by a GAT Access 6100 for Ethernet and is this configurable?
- 8.5 How can I set the date and time of a GAT Access 6100?
- 8.6 How can I find the IP address of a GAT Access 6100 and change it?
- 8.7 How can I find the MAC address of a GAT Access 6100?
- 8.8 Setting IP address when MAC address is not known and IP address of the terminal is 0.0.0.0
- 8.9 Difference between "Time" and "Delay" in the "Mode" field for Locker Check-In configuration?
- 8.10 Meaning of optocoupler settings "Rising_Edge", "Falling_Edge", "Rising- and Falling Edge"?
- 8.11 How can the reader of a GAT Access 6100 B be authorised for LEGICĀ®?
- 8.12 How can I read or delete the authorisation data of a GAT Access 6100?
- 8.13 How can I configure the display texts of a GAT Access 6100?
- 8.14 The relay of the GAT Access 6100 is activated even if the host has denied access.
- 8.15 Which FUNLINE protocol commands are supported by a GAT Access 6100?
- 8.16 Why does the GAT Access 6100 deny access with my data carrier in Emergency mode?
- 8.17 What is the maximum start-up current consumption of a GAT Access 6100?
- 8.18 What are the factory settings of a GAT Access 6100?
- 8.19 How do I configure a GAT Access 6100 for offline emergency mode?
- 8.20 What is the data carrier certificate?
- 9. Technical Data

GAT Access 6100, GAT Access 6100 F BIO, GAT Access 6100 F Enrollment Station, GAT TimeAxx 6150
Start-Up and Configuration
www.gantner.com
HB_GAT-ACCESS6100--EN_12
31
4. START-UP AND CONFIGURATION
The GAT Access 6100 terminals start automatically as soon as power supply is supplied. Generally, the different
types of GAT Access 6100 have the same start-up procedure.
For the configuration of the GAT Access 6100 it must be differentiated between system settings and functionality
settings. The system settings define the device setup like communication parameters and the functionality settings
define the operation of the device.
4.1 Starting the GAT Access 6100
When connecting power the bootloader starts first. The GANTNER logo and the installed software version ("BL-
Vers.") is displayed and the LED status bar and the reader centre lights flash green and red alternately. The
terminal also checks for a connected network. These first steps can take about 1 minute.
Figure 4.1 - Start-up screen of GAT Access 6100
The display will turn blank and shortly after the terminal shows the current system settings on the display.
Figure 4.2 - System settings display during start-up