4. START-UP AND CONFIGURATION
The GAT Access 6100 terminals start automatically as soon as power supply is supplied. Generally, the different
types of GAT Access 6100 have the same start-up procedure.
For the configuration of the GAT Access 6100 it must be differentiated between system settings and functionality
settings. The system settings define the device setup like communication parameters and the functionality settings
define the operation of the device.
4.1 Starting the GAT Access 6100
When connecting power the bootloader starts first. The GANTNER logo and the installed software version ("BL-
Vers.") is displayed and the LED status bar and the reader centre lights flash green and red alternately. The
terminal also checks for a connected network. These first steps can take about 1 minute.
Figure 4.1 - Start-up screen of GAT Access 6100
The display will turn blank and shortly after the terminal shows the current system settings on the display.
Figure 4.2 - System settings display during start-up