User's Manual

Table Of Contents
GAT Access 6100, GAT Access 6100 F BIO, GAT Access 6100 F Enrollment Station, GAT TimeAxx 6150
Start-Up and Configuration
www.gantner.com
HB_GAT-ACCESS6100--EN_12
39
The configuration settings of the GAT Access 6100 are organised into several categories. The directory on the left
(1) lists the different configuration categories. Click on a category and the settings for this category can be viewed
and adjusted in the field to the right (2). A short description of the setting is shown at the bottom of the window (3).
An overview of all the configuration settings is available in Table 4.1.
Note: A more detailed description of all available settings can be found in the GAT Config Manager manual.
4.3.2 Project Configuration
Complete the following steps to configure the GAT Access 6100 via a project in GAT Config Manager.
Click on the “Open Project” icon (1 in Figure 4.17) to find an existing project. Alternatively, click on the “Create
Project” icon (2 in Figure 4.17) to start a new project.
Figure 4.17 GAT Config Manager - project setup
Once a project is established, click on the “Scan Device” icon (1 in Figure 4.18).
o The software scans the network and displays a list of all connected GANTNER devices.
Select your GAT Access 6100 from the list. Use device details such as the IP and MAC address to identify the
correct device.
o The selected device is highlighted in blue as shown in Figure 4.18.
Click on “OK” (2 in Figure 4.18).
o The selected device is added to the “Devices” list (3 in Figure 4.18).