3.7. Transportation
The locker locks GAT Lock 6010 F may be installed at the manufacturer of the
lockers and the lockers will then be transported to the site, where they are
installed and put into operation.
The batteries must be inserted into the GAT Lock 6010 F
after the transportation, i.e. after the lockers are installed
on site! If the batteries would be in the locks during
transportation, the batteries could get empty and so the
lockers cannot be opened anymore!