Installation Instructions

Table Of Contents
GL7p - Battery-powered, door-mounted electronic locker lock GL7p
Commissioning
www.gantner.com
HB_GL7p--EN_12
33
Complete the instructions described in section “4.2.2. Inserting the Battery”.
Press the locker door shut with one hand and hold it shut.
Press the button of the GL7p in completely using the BATTERY data carrier.
o The BATTERY data carrier is read by the GL7p and, if read correctly, the GL7p is enabled.
Figure 4.3 Activating the GL7p with the BATTERY data carrier
After battery replacement, it is recommended to always check the date and time of the GL7p and set them
correctly if necessary.
4.3 USB Connection
To connect to a computer with Windows
®
operating system (Windows
®
7 or higher), a Micro-B USB port is
provided on the side of the GL7p. The USB port location on the side of the lock allows configuration to be
carried out even while the lock is installed.
NOTE! The maximum cable length between the GL7p and a computer is 5 m. The Micro-B USB connector can have
a maximum width of 4 mm.
After the USB cable is connected, the SERVICE data carrier (see "6.5.6 SERVICE Data Carrier") is used to put
the GL7p into configuration mode. A 3 m USB cable, the SERVICE data carrier, and GAT Config Manager
configuration software are included in the GAT ECO.Basic Set (see section 6.4 GAT ECO.Basic Set FD).