Installation Instructions

GAT NET.Lock 7020 System
Installation
24
HB_GAT-NETLOCK7020--EN_12
www.gantner.com
3.8
Installation Requirements for the GAT NET.Lock 7020 and Bolt Set
During the installation, please pay particular attention to the following points:
- When the door is pressed shut, ensure there is no gap between the bolt set and the front of the GAT NET.Lock
7020. Ideally, the bolt set should touch the front of the lock.
- The locker door, the bolt set, and the front side of the GAT NET.Lock 7020 must be perpendicular and parallel to
each other.
- If right and left-hinged doors are in use together, please note the correct LED position. The GAT NET.Lock 7020
is mounted upside-down on left doors in comparison to right doors.
Figure 3.2 - LED positions of the GAT NET.Lock 7020 for right and left-hinged doors
NOTE! Before installing all locks in a new locker system, a test installation of one lock into a completed locker and
a function check must be performed. See section “3.2. Test Installation”.