Installation Guide

Page 2
STEP 1: ATTACHING TH E FIRST S IDE T O THE PYRAM ID CAP
Place the solid pyramid cap on its side on your work surface. Place the “point” of one triangular trellis panel on top
of the connector stub at the base of the pyramid, with the cross-members on the underside of the trellis panel (facing
down).
Line up the right edge of the right-hand side of the trellis piece so that it is exactly flush with the right side of the
connector stub (see Diagram 1). The left edge of the left-hand side of the trellis piece should be flush with the left
edge of the pyramid (not the connector stub!).
DIAGRAM 1
Connec-
tor stub
Right edge of
frame flush
with edge of
connector stub
Connec-
tor stub
Holes
down left
Holding the trellis end firmly against the base of the pyramid cap and with its right edge flush to the connector
stub, drive in the right-hand screw. Then drive in the left screw, again keeping a snug fit.