Operation Manual
Table Of Contents
- Contents
- Introduction
- Safety
- Installation
- Presentation
- Preparations
- Charging station
- Charging the battery
- Boundary wire
- Connecting the boundary wire
- Installation of the guide wire
- Checking the installation
- First start-up and calibration
- Control panel
- Menu structure
- Timer
- SensorControl
- Smart System
- Security
- Installation
- Settings
- Menu structure overview
- Menu structure overview
- Yard layout examples
- Open and level area
- A number of islands and a 35% slope
- L-shaped garden with a couple of islands and the charging station installed in the narrow area
- U-shaped garden linked with a narrow passage
- Unsymmetrical working area with a narrow passage and a number of islands
- 3 areas linked with two narrow passages
- A secondary area
- Operation
- Maintenance
- Troubleshooting
- Transportation, storage and disposal
- Technical data
- Warranty
- EC Declaration of Conformity

3.19 Menu structure overview
Installation
Lawn
coverage
Area 1-3
How?
How
often?
How
far?
Disable
ResetTest
More
Exit
angles
Corridor
width
Reversing
distance
Drive
past wire
Advanced
Settings
ECO mode
Time &
date
Set time Set date Time format
Date format
Language Country
Reset all
user setting
About
General
On/Off
32 - Installation 307 - 002 - 11.10.2017