Installation Instructions

GTN 6XX/7XX AML STC Installation Manual 190-01007-A3
Page E-14 Rev. 4
NOTES:
1. ALL WIRES 24 AWG OR LARGER UNLESS OTHERWISE SPECIFIED.
2. GROUND DESIGNATIONS: SHIELD BLOCK GROUND AIRFRAME GROUND
3. AT GTN 6XX/7XX, CONNECT SHIELD GROUNDS TO THE CONNECTOR BACKSHELL -- THE SHIELD TERMINATION LEADS
MUST BE LESS THAN 3.0". CONNECT OTHER END OF THE SHIELD PER THE REMOTE EQUIPMENT INSTALLATION
REQUIREMENTS. IF NO SHIELD TERMINATION REQUIREMENT EXISTS FOR THE REMOTE EQUIPMENT, TERMINATE
SHIELDS AS SHORT AS POSSIBLE, NOT TO EXCEED 3.0". SEE SECTION 2.4.11.4.
4. IF THE ARINC 429 IN 1 PORT (P1001 PINS -48 AND -67) IS ALREADY USED FOR ANOTHER PURPOSE, ANY AVAILABLE
ARINC 429 IN PORT MAY BE CONNECTED INSTEAD.
5. REFER TO MANUFACTURER’S DOCUMENTATION FOR COMPLETE PINOUT AND INTERCONNECT INFORMATION. PINOUTS
OF OTHER UNITS SHOWN FOR REFERENCE ONLY.
6. REFER TO SECTION 5.5.1.1 FOR GTN 6XX/7XX CONFIGURATION SETTINGS.
7. SG 465 SOFTWARE 1101 OR LATER IS REQUIRED FOR PROPER OPERATION WITH THE GTN 6XX/7XX UNIT.
USE THE FOLLOWING SETTINGS FOR CONFIGURING THE EFIS 40/50 WITH SOFTWARE 1101 OR LATER:
FMS VNAV CONFIGURATION: 2: FEET OR ANGLE
VARIABLE LNAV CONFIGURATION: LNAV 1/2:VAR
FMS #1/#2 CONFIGURATION: 5: KLN 90-GPS*
*KLN 90-GPS SETTING MUST BE USED FOR VERTICAL GPS DEVIATION TO BE DISPLAYED CORRECTLY.
USE THE FOLLOWING SETTINGS FOR CONFIGURING THE EFIS 40/50 WITH SOFTWARE 1501 OR LATER:
FMS VNAV CONFIGURATION: 2: FEET OR ANGLE
FMS #1/#2 CONFIGURATION: 7: GAMA 429-GPS
LNAV X-TRACK SCALE FACTOR: LNAV 1/2:VAR (AS APPROPRIATE)
VNAV DEVIATION SCALE FACTOR: LNAV 1/2:VAR (AS APPROPRIATE)
LNAV VERT APR COUPLING TO AFCS: LNAV 1/2:YES (AS APPROPRIATE)
L/VNAV VERT APR COUPLING TO AFCS: LNAV 1/2:YES (AS APPROPRIATE)
LP VERT APR COUPLING TO AFCS: LNAV 1/2:YES (AS APPROPRIATE)
LPV VERT APR COUPLING TO AFCS: LNAV 1/2:YES (AS APPROPRIATE)
LNAV SELECT OUT: 1: ENROUTE ONLY (SETTING DOES NOT MATTER IF THIS
DISCRETE OUTPUT IS NOT USED IN THE INSTALLATION)
8. THESE OUTPUTS ARE USED ON THE GTN 650/750 ONLY.
9. WIRE AS SHOWN FOR GTN #1 IN A SINGLE GTN INSTALLATION.
10. THE SPLICE MUST BE PERFORMED AT THE REMOTE END CONNECTOR IN ACCORDANCE WITH THE MANUFACTURER’S
EQUIPMENT INSTALLATION MANUAL. SPLICE AS SHOWN:
s
PXX
LRU
Figure E-6. GTN 6XX/7XX ARINC 429 EFIS Interconnect
Sheet 3 of 3