Installation Instructions

190-01007-A3 GTN 6XX/7XX AML STC Installation Manual
Rev. 4 Page G-3
5/16" TERMINAL LUG
MS20659-131
OVERBRAID
QQB575R30T0437
OR
QQB575F36T0781
NOTES:
THE OVERBRAID MUST BE INSERTED INTO THE GROUNDING LUG BY "COMBING"
IT OUT
INTO A FLAT CONFIGURATION AND THEN COMPRESS INTO A SMALL DIAMETER BUNDLE
NEAR ITS END WHICH MAY BE INSERTED INTO THE GROUNDING LUG.
WEATHER RADAR
CONNECTOR
1
ALL HSDB CABLING THAT ENTERS THE
METAL FUSELAGE
OVERBRAID INSTALLED OVER WEATHER
RADAR CABLING THAT IS IN RADOME AREA,
PRIOR TO ENTERING THE METAL FUSELAGE
1
OVERBRAID ENDS
Ensure that the
overbraid does not
protrude more than ¼”
past the strain relief bar
into the backshell.
ELECTRICAL TIE-DOWN STRAP
MS3367-{1, 2
, or 7
}-X
Figure G-1. WXR HSDB Cable Overbraid Installation