Instruction Manual
3. Attach CS bracket(s) to the
pole mount fixture
You can attach one or two charging station(s) to both
the single (EPPFS) and the double (EPPFD) pole mount
fixture. The double version (EPPFD) is recomended for
daisychaining (when several CS & poles are installed
using the same power cable)
3.1 Attach a CS bracket to the single
(EPPFS) pole mount fixture
4 Nm
1
Note: A second CS can be installed on the back of the
mounting plate of the pole mount fixture. In that case the
long screws must be used.
3.2 Attach two CS brackets to the double
(EPPFD) pole mount fixture
1
Note: Only remove the water protection plate when
you attach two CS on the pole attachment.
4 Nm
4 Nm
A
B
2
Note: Thread the cables through CS bracket (A) before
you attach the bracket to the pole mount fixture and CS
bracket (B).
EN
7










