Reflex 105 Balanced Flue Installation Instructions

42
Once in position, tilt the liner forwards and carefully manoeuvre out
of the rebox.
7
To replace the liners and bafe reverse these procedures.
Ensure no amber glass or black shale has fallen onto the Liner
Support Brackets.
REPLACING THE POWER CABLE
BEFORE UNDERTAKING ANY WORK SWITCH OFF THE
APPLIANCE AND ISOLATE THE POWER SUPPLY ENSURING
THERE IS NO POWER TO THE APPLIANCE.
To replace the Power Cable first remove the Main Control
Assembly.
Disconnect the 3 cables from the Power Module, Arrow A.
NOTE THE CONFIGURATION OF THE WIRES.
A
B
1
Remove the nuts from the Earth stud and remove the two Ring
Terminals, Arrow B.
Remove the 2 screws securing the Power Cable Plate to the rear
of the rebox.
2
Withdraw the old cable.
Fit the new cable in reverse order ensuring it is rewired in the
original conguration.
SERVICING INSTRUCTIONS