Reflex 105 Balanced Flue User Installation Manual
46
Servicing Instructions - Replacing Parts
13.4 Undo the Injectors individually and remove, see Diagram 38.
38
13.5 Replace with the correct size Injector, see table on Page 12.
NOTE: DO NOT OVERTIGHTEN.
Use thread sealant Loctite 572 when replacing Injectors.
13.6 Repeat for the remaining Injectors.
13.7 Check for leaks.
14. Latching Solenoid
14.1 Remove the Main Control Assembly, see Section 4.
14.2 Remove the cradle holding the rear LED's to access the
pipe work for the solenoid, see Section 5.
14.3 Undo the 3 nuts shown and free the solenoid from the pipe
work, see Diagram 39.
39
A
(Beneath Lip)
14.4 Remove the Solenoid plug from the Control Box,
see Diagram 39 Arrow A.
NOTE the orientation of the cables.
14.5 Replace in reverse order.
15. Changing Between Gas Types
In order to change between gas types, it will be necessary
to change the following components:
Pilot
Main Injectors x 8
Crosslighting Injector
Gas Valve
Main Burner x 4
Contact your Gazco retailer for further information.
A kit of parts is available for this. Always quote the Model
number and Serial number when ordering any spare parts.
16. Baffle
16.1 The Bafe must be removed before the Liners can be taken
out of the appliance.
BAFFLE
16.2 Undo the 5 screws securing the bafe to the roof of the
rebox, see Diagram 40.
Screws
40
16.3 The Bafe can now be removed by lowering the front edge
and pulling forward through the front of the appliance.
TAKE CARE NOT TO DAMAGE THE SIDE PANELS.
16.4 When replacing the Bafe ensure that the 3 tabs t into the
slots in the rear liner bracket see Diagram 41.
41
Top View