Logic HE Conventional Flue Combined Controls Installation User Instructions

28
Commissioning
1. Commissioning
1.1 Close all windows and doors to the room, check all controls,
and allow appliance to burn on maximum for 5 minutes.
Test for spillage of flue products using a smoke match. Pass
the lighted smoke match along the top front of the draught
diverter, just inside, see Diagram 1.
1
1.2 If the appliance spills, run for a further 10 minutes and
re-check.
1.3 Complete the Commissioning Checklist at the front of this
manual covering:
— Thermocouple soundness checks.
This is to include ensuring the thermocouple is secure on
the pilot bracket assembly, lead connection and integrity.
— Flue checks
— Gas checks
— Fuel effect layout - flame picture
1.4 Upon completion of the commissioning and testing of the
installation and correct operation of the appliance, the
installer must instruct the user how to operate the appliance.
1.5 Guide the user through the User Instructions paying
particular attention to:
a) Regular servicing (Section 9 of the User Instructions).
b) Ventilation (Section 10 of the User Instructions) - point out
the ventilation positions where applicable.
c) Hot surfaces (Section 12 of the User Instructions).
If there are any extractor fans in the room or adjacent
rooms, the test must be repeated with the fans running on
maximum.
IF SPILLAGE PERSISTS, DISCONNECT THE APPLIANCE AND
SEEK EXPERT ADVICE.
For future reference record the installation details on the
commissioning sheet on page 3 of these instructions.