Replacement Part List

ZZZ-187.W1207MR.0529-20.GP.EN.doc WEB VERSION
6
STEP #8
Lift up door and track inside of solarium then set it over the door opening by screwing at the top. First
use bolts (Ww) and washers (Gg-3) on the inside and female bolts (Cc-3-2) on the outside for the top
assembly. See diagram below. Attach lower track with bolts (Cc-3) and washers (Gg-3). Set up door
latch on the side required for your door to lock, adjust latch as required.
STEP #9
Install crossbeams (L1, L2) under rafters (F, F1, G).
Use Cc-3 screws + Hh-3 nuts for the splice, then secure to the rafter with Cc-3 screws.
Make sure it’s tight.
Ww