Owner manual

Infinity D Power System Installation Guide: -48V Plants H2007001
Issue 2.0, June 3, 2009 22
Packaging
All packages should be opened with a box cutter with the blade minimally exposed so
that only the sealing tape is cut.
Save all packaging material until the system has been powered up and all parts are
operating within specifications
.
Installation Tools
You will need the following tools to install and test the Infinity D.
Wire cutters and strippers
Heat shrink gun
5/16-inch (8 mm) hex driver
Digital meter with an accuracy of
±0.02%
Screw drivers (flat-blade and
Phillips)
ESD wrist strap
48 or/and 24V test load
Calibrated clamp-on dc current
meter (0.1 ADC sensitivity)
Torque wrench
Socket wrenches:
7/16” and 9/16” for load and
battery connections;
19 mm for anchor bolts;
12" extension for socket
Masonry drill kit as required
Compression for installation of
various compression lugs
Protective canvas
Insulating rubber mat
Standard insulated installation tools,
screwdrivers, etc.
Required Insulated Tool Kit 1000v
DC Telecom set to include ESD
protection