Owner manual

Infinity D Power System Installation Guide: -48V Plants H2007001
Issue 2.0, June 3, 2009 51
Wire Loads served by GMT Type Fuses
Step Action
1.
Open the Converter or Rectifier System
Module door
2.
Locate Circuit Breaker (CB) mounting
panel.
3.
Install a 6 position GMT type fuse holder
in 2 Circuit Breaker distribution positions
(see picture)
4.
Terminate the return busbar according to
the instructions provided with the GMT
fuse holder kit.
5.
Complete installation and wiring
according to the instructions provided
with the kit.
Return
Termination
p
oints