Installation Guide Manual

7. Remove anchoring plate “E” from all
four legs and unscrew supporting
block screws “F”.
8.
Divide the supporting blocks with a
hammer and save blocks “G” and “H
for ramp supports.
F
SG Series 50 & 80 kVA
9. Place blocks “G” and “H” and frames
B” and “C” under ramp for support.
10.
Make sure leveling feet are raised
and carefully role UPS down ramp.
NOTE !
Take care not to damage the UPS when moving by forklift.
A damaged UPS must never be installed or connected to mains or battery!
In case of any damage sustained during the transport, immediately inform the
shipping agent!
A detailed report of the damage is necessary for any indemnity claim.
For parallel systems, the delivery also includes the bus control cables for inter-
connecting the UPS modules.
Packing material recycling
GE, in compliance with environment protection, use only environmentally friendly
material.
UPS packing materials must be recycled in compliance with all applicable
regulations.
F
H
E
G
B
G
H
C
Modifications reserved Page 17/38
OPM_SGS_ISG_50K_80K_0US_V040.doc Installation Guide