User's Manual
Table Of Contents
- Slide Number 1
- Document Control
- Transport
- Storage
- Unpacking of Equipment
- Installation
- Slide Number 7
- Specialty Tools Required / Adhesives
- Specialty Tools Required / Adhesives
- Specialty Tools Required / Adhesives
- In Vehicle Unit (IVU) (PROD0842)
- Input Power & Signal Connections
- Input Power & Signal Connections
- IVU Mounting
- Mounting Locations & Cable Runs
- Mounting Locations & Cable Runs
- Light Vehicle
- Light Vehicle
- Haul Truck
- Haul Truck
- Slide Number 21
- Slide Number 22
- Slide Number 23
- Slide Number 24
- Heavy vehicle (excluding Haul Truck)
- Heavy vehicle (excluding Haul Truck)
- Display Unit (PROD0839)
- Display Unit (PROD0839)
- Display Unit (PROD0839)
- Display Unit (PROD0839)
- Display Unit (PROD0839)
- RF Installations
- RF Installations
- Upgrades
- Interconnections – 4CAM/4RF
- Interconnections – 4CAM/4RF
- Interconnections – 1CAM/1RF
- Interconnections – 1CAM/1RF
- Interconnections - LV
- Interconnections - LV
- Input Power & Signal Connections
- Slide Number 42
- Slide Number 43
- Deutsch Connector
- Input Power & Signal Connections
- Input Power & Signal Connections
- General Wiring Principles
- Antenna cable terminations
- Antenna cable terminations
- Antenna cable terminations
- Antenna cable terminations
- Antenna cable terminations
- Antenna cable terminations
- Testing Antenna cable terminations
- Testing Antenna cable terminations
- Antenna Cable Connection Security
- Configuration
- Configuration – Installation Measurements
- Configuration – Installation Measurements
- Configuration – Installation Measurements
- IVU Orientation
- IVU Orientation (Examples)
- Configuration
- Configuration
- Shovel with Heading
- Shovel with Heading Overview
- Primary IVU Configuration
- Primary IVU Configuration
- Secondary IVU Installation
- Secondary IVU Wiring
- Secondary IVU Configuration
- Shovel Heading Testing
- Shovel Heading Testing
- Configuration & Install Record
- Configuration & Install Record
- Configuration & Install Record
- Record Keeping
- Trouble Shooting
- Trouble Shooting
- Trouble Shooting
- Service and Maintenance
- Service and Maintenance
- Decommission
- Disposal
- Disclaimer
- Disclaimer
- Contact Details
- Slide Number 88
15
CAS GPS Installation Manual Rev G1
2/17/2016
Mounting Locations & Cable Runs
The following diagrams show the preferred mounting locations and cable paths for
each vehicle type. Ensure the hardware supplied in the kit is being utilised.
Ensure there is a clear line of sight from all directions for the Antennas. It is a
recommendation on all Haul trucks the Antennas are to protrude above the Tray by
100mm, by doing this it creates a clear line of sight for the Antennas on all vehicles.
Keep in mind any working obstacles.
Ensure the correct size Stauff Clamp is used and matched to the specific handrail for
that machine and antenna mounting post diameter. Regular clamp bodies are
available in the following sizes: 38mm, 42mm, 44.5mm, 48.3mm, 50.8mm, 55mm,
57mm, 60.3mm, 60.5mm, and 70mm.
Stauff Clamp Rubber inserts are also available in all kits to maintain the correct
clamping on all Hand rail sizes and Antenna mounting post. Rubber inserts are
available in the following sizes: 32mm, 33.7mm, 35mm, 38.7mm, 40mm, 42mm,
45.5mm, 48mm, 51mm, 53.4mm, 56.4mm
Ensure all stauff clamp assemblies are tightened and secured correctly.
Ensure Loctite 243 is used to secure all Antenna mounting fasteners, or the equivalent
to this is Loctite 248. Loctite 248 (perfect for transporting by air as it is a paste).