User's Manual

Table Of Contents
3
CAS GPS Installation Manual Rev G1
2/17/2016
Transport
All possible precautions are taken to protect the equipment against damage or losses
during shipment, however before accepting delivery, check all items against the
packing list or bill of loading. If there are shortages or evidence of physical damage,
notify GE Mining immediately.
Notify GE Mining within 7 days (maximum) in case of shortages or discrepancies,
according to the packing list. This will help ensure a speedy resolution to any
perceived problems. Keep a record of all claims and correspondence. Photos are
recommended.
Where practicable do not remove protective covers prior to installation unless there
are indications of damage. Boxes opened for inspection and inventory should be
carefully repacked to ensure protection of the contents or else the parts should be
packaged and stored in a safe place. Examine all packing boxes, wrappings and
covers for items attached to them, especially if the wrappings are to be discarded.