DL 4819b9549723c992563f9f0361cf

14 31-10724-7
Installation Instructions
INSTALLATION – RECIRCULATING
DUCTWORK, WIRING LOCATIONS
Determine the exact location of the vent hood.
Locate the template packed with the literature.
Measure 36″ from the floor to the top of the cooking
surface. Add hood installation height determined on
page 8. Mark that location.
Tape the template in position along the penciled line.
CHECK TO BE SURE THE TEMPLATE IS LEVEL.
Use a level to draw a line straight up, from the
centerline on the template to the ceiling.
HOUSE WIRING LOCATION:
The junction box is located on the top left side of the
hood.
Wiring can enter from the back wall or ceiling above
the top bracket location. Route additional wiring
length to reach the junction box.
1
INSTALL FRAMING FOR HOOD
SUPPORT
IMPORTANT: The vent hood must be secured to
rear support framing or a wall stud. Framing must be
capable of supporting 100 lbs.
If drywall is present, mark the screw hole locations for
the top mounting brackets. Remove the template.
Cut away enough drywall to expose 2 vertical studs
at the bracket location indicated on the template.
Install a horizontal support at least 1″ x 12″ between
two wall studs at the mounting screw location. The
horizontal support must be flush with the room
side of the studs. Use cleats behind both sides of
the support to secure to wall studs.
IMPORTANT: Reinstall drywall for an even mounting
surface.
• Drill 1/8" Pilot Holes For Mounting Brackets.
Align edge 25-1/2" above Cooking Surface.
17-5/16"
3-15/16"
13-9/16"
2-5/32"
C
L
• Drill 1/8" Pilot Holes.
• Drill 1/8" Pilot Holes.
5-7/8"
View from
rear cleats
1″ x 12″ min.
mounting
support
Centerline of
installation
space
NOTE: 2 horizontal supports
will be needed if there is a
stud located between the
horizontal screw locations.