DL 4819b9549723c992563f9f0361cf

31-10724-7 7
Installation Preparation
REMOVE THE PACKAGING
CAUTION
Wear gloves to protect against sharp
edges.
The vent hood is shipped secured to a shipping board
with 4 screws.
Remove the duct cover, parts box and foam
packaging.
Lift the hood out of the box.
Remove and properly discard the plastic wrapping.
Remove metal grease filters and side bar packaging.
To remove the shipping board, locate and remove 2
screws at the top of the assembly and 2 screws inside
the hood behind the filter guides on the left and right
sides. Discard the shipping board.
Remove junction box cover.
Remove knockout from junction box.
Install strain relief onto junction box.
CHECK INSTALLATION HARDWARE
Locate the hardware accessory box packed with the
hood and check contents.
Mounting screw
Shipping board
Shipping board
Mounting screw
Mounting
screw
Knockout
Junction box
3 charcoal filters
Air deflector with upper
duct connector
658Dia35
• Drill 1/8" Pilot Holes For Mounting Brackets.
Align edge 25-1/2" above Cooking Surface.
17-5/16"
3-15/16"
13-9/16"
2-5/32"
C
L
• Drill 1/8" Pilot Holes.
• Drill 1/8" Pilot Holes.
5-7/8"
Wall-mount template
658Dia37
10 wood
screws
658Dia38
10 metal wall
fasteners
2 Large
flat washers
658Dia53
2 Mounting brackets
658Dia52
3 Stainless
steel grease
filters
Decorative
duct covers
658Dia36
Duct cover bracket (not required
for recirculating operation)
2 Phillips-head
duct cover
screws
658Dia16
Additional Parts for Recirculation Operation
NOTE: Additional tools, materials and hardware are required to
construct your wall framing support.
2 Utensil rods with 4 machine screws