DL 2ec018a52e3899a304151fc07370

REMOVE THE PACKAGING
CAUTION: Wear gloves to protect
against sharp edges.
The vent hood is packed with the duct cover and
support frames.
Remove the hood, parts and packaging.
Remove junction box cover.
Install strain relief onto junction box cover
(not supplied).
NOTE: Additional tools, materials and hardware are
required to construct your ceiling support.
Check Installation Hardware
Locate the hardware accessory bag packed with the
hood and check contents.
Front of Hood
Template
4 Hex-head
wood lag
screws
(6 mm x
2-1/2 or 1/4
x 2-1/2)
2 Stop screws
(One is in the service
manual envelope.
Leave that screw in
the envelope.)
4 Flat
washers
3 Stainless
steel grease filters
Decorative
duct covers
2 Phillips-head
duct cover
screws
2 Utensil rods with 4 machine screws
7
Installation Preparation
4 (10 mm) Nuts
and lock
washers
Support
frames with 8
screws and 8
washers
8 Frame
attachment
screws with
washers (attached
to accessory
support frames)
Mounting screw holes
Additional Parts for Recirculating Operation
3 Charcoal filters
Air deflector with upper
duct connector and 4
small flat-head screws