Installation Instructions ZJ7000 and ZW9000 Electric Warming Drawer 31-10700-5 12-14 GE monogram.
Safety Information WARNING BEFORE YOU BEGIN Read these instructions completely and carefully. • This appliance must be properly grounded. See “Grounding the Appliance.” • Insure that the power cord does not contact the hot surface on the bottom of ovens, cooktops, or other appliances. • If you received a damaged warming drawer, you should contact your dealer IMPORTANT • ³ Save these instructions for local inspector’s use. • IMPORTANT ³ Observe all governing codes and ordinances.
Design Information CONTENTS Installation Instructions Step 1, Anti-Tip Brackets ......................................................9 Step 2, Install Warming Drawer .......................................9 Custom Panel Accessory Kit Installation........... 10, 11 Professional Style Panel Accessory Kit Installation .................................................12 Design Information Models Available ......................................................................3 Accessories......................
Design Information PRODUCT DIMENSIONS AND CLEARANCES 23-1/4” A Drawer Open 1” 10-1/2” 9” C B Including Handle Dimensions A B C ZW9000 22” 26” 30” ZW9000 w/ZXD9030P 23-1/4” 27-1/2” 30” ZJ7000 22”26” 26-3/4” 27” 4
Design Information GROUNDING THE APPLIANCE Please read carefully. Do not use an extension cord or adapter plug with this appliance. Follow National electrical codes or prevailing local codes and ordinances. This warming drawer must be supplied with 120V, 60Hz, and connected to an individual, properly grounded branch circuit, and protected by a 15 or 20 amp circuit breaker or time delay fuse. • A properly grounded 3-prong receptacle should be located within reach of the drawers’ 56” long power cord.
Installation Preparation MATERIALS REQUIRED (provided) TOOLS REQUIRED Hand Saw 4 Wood Screws Safety Glasses MATERIALS REQUIRED (not provided) Drill and 1/16” Bit Phillips Screwdriver Measuring Tape Level 2x2 or 2x4 Wood Block for Anti-Tip Security Cut Resistant Gloves 2x2 or 2x4 Lumber for Runners Adhesive or other hardware for installing runners or shelf to support warmer drawer Runners must be level, rigidly mounted and capable of supporting 150 pounds.
Installation Preparation INSTALLATION OPTIONS Installation Below a Double Oven Installation Below a Single Oven 23-1/2” Min. Inside 23-1/2” Min. Inside 2x2 or 2x4 Anti-Tip Block Against Rear Wall, 9” From Floor to Bottom of Block 2x2 or 2x4 Anti-Tip Block Against Rear Wall, 9” From Floor to Bottom of Block Oven Cutout Oven Cutout 2” Min. 9” Allow 5/8” Overlap on All Sides 9-1/4” Allow 5/8” Overlap on All Sides 2” Min. 23-1/4” 23-1/4” 9” 9-1/4” 10-1/2” 10-1/2” A 1” Min.
Installation Preparation INSTALLATION BELOW A COUNTERTOP Electrical Outlet 16” Max. From Left Side Electrical Outlet Flush With Side of Install 2x4 or 2x2 Anti-Tip Block Cabinet 7” Max. 7” Against Rear Cabinet Wall 9” From Floor to Bottom of Block Electrical Outlet 42” Max. From Right Side 1-1/2” Cabinet Top 25” Install a Solid Barrier Below a Cooktop See Note 1” Min.* 36” Countertop Height 9” A 9-1/4” Solid Barrier 23-1/2” Min.
Installation PROVIDE CABINET SUPPORT 2”x4” or Equivalent Runners 2”x4” or Equivalent Runners 23-1/2” 23-1/2” 22” 27” 25” 30” IMPORTANT: When installed below a single or double oven, check to be sure that any oven supports above the cutout do not obstruct the 23-1/2” required depth of the warming drawer cutout. • The support must be level and rigidly mounted, flush with the bottom edge of the cutout. – There is no way to level the drawer once it has been installed. Be sure supports are level.
WARMING DRAWER CUSTOM PANEL ACCESSORY KIT Installation Instructions ZXD27B AND ZXD30B For installation of 27” and 30” wide warming drawer custom panel and custom handle. BEFORE YOU BEGIN • The custom drawer front panel, both raised and flat design, should be constructed in the same manner as typical cabinet doors. • Order the custom drawer panel from the cabinet manufacturer. Be sure to provide the exact dimensions so that the panel is constructed accurately.
Installation STEP 4 STEP 7 SECURE CUSTOM PANEL TO METAL MOUNTING PANEL • Lay the custom panel, appearance side down, on a clean surface. • Remove all tape and packing material from the metal panel. • Place the flat side of the metal panel onto the back side of the custom panel, with the mounting flanges facing up. • Align the lamp hole in the panel with the mounting panel. • Confirm squareness and correct position of the metal panel to the custom panel.
Installation Instructions PROFESSIONAL STYLE PANEL ACCESSORY KIT ZXD9030P BEFORE YOU BEGIN STEP 2 REMOVE ORIGINAL DRAWER FRONT Read these instructions completely and carefully. IMPORTANT • Remove the three screws from the bottom of the drawer edge. • Remove the four screws on the inside of the drawer at the top. Retain all screws. – Support the drawer front as you remove screws to prevent the front panel from falling. – Save these instructions for local inspector’s use.
Notes 13
Notes 14
Notes 15
NOTE: While performing installations described in this book, safety glasses or goggles should be worn. For Monogram® local service in your area, call 1.800.444.1845. NOTE: Product improvement is a continuing endeavor at General Electric. Therefore, materials, appearance and specifications are subject to change without notice. GE Appliances & Lighting General Electric Company Appliance Park Louisville, KY 40225 GEAppliances.