Owners manual

18
49-80549-2
Installation Instructions
,167$//$7,21³5(&,5&8/$7,1*
DUCTWORK, WIRING LOCATIONS
'HWHUPLQHWKHH[DFWORFDWLRQRIWKHYHQWKRRG
Locate the template packed with the literature.
Measure 36” from the floor to the top of the cooking
surface. Add hood installation height determined on
pages 8 and 13. Mark that location.
Tape the template in position along the penciled line.
CHECK TO BE SURE THE TEMPLATE IS LEVEL.
Use a level to draw a line straight up, from the
centerline on the template to the ceiling.
HOUSE WIRING LOCATION:
7KHMXQFWLRQER[LVORFDWHGRQWKHWRSOHIWVLGHRIWKH
hood.
Wiring should enter the back wall at least 18”
above the bottom of the hood, and within 5” of the
centerline.
1
INSTALL FRAMING FOR HOOD
SUPPORT
IMPORTANT: Framing must be capable of
supporting 100 lbs.
If drywall is present, mark the screw hole locations
for the top mounting brackets. Remove the template.
&XWDZD\HQRXJKGU\ZDOOWRH[SRVHYHUWLFDOVWXGV
at the bracket location indicated on the template.
,QVWDOODKRUL]RQWDOVXSSRUWDWOHDVWµ[µEHWZHHQ
two wall studs at the mounting screw location. The
horizontal support must be flush with the room
side of the studs. Use cleats behind both sides of
the support to secure to wall studs.
NOTE: 2 horizontal supports will be needed if there is
a stud located between the horizontal screw locations
(see figure).
IMPORTANT: Reinstall drywall for an even mounting
surface.
REAR WALL
MOUNTING TEMPLATE
Vertical Centerline
ALIGN BOTTOM EDGE
WITH PENCIL LINE
INDICATING BOTTOM
OF THE HOOD
11-7/16"
Installation Height
Horizontal Line
C
L
DRILL 2 (TWO) 3/16" PILOT HOLES THROUGH STUDS OR RE AR WALL SUPPORT
10-1/8"
12-08 JR
2"
DRILL 2 (TWO) 3/16" PILOT HOLES THROUGH STUDS OR RE AR WALL SUPPORT
12-1/2"
WALL VENT IS 27-3/4" MIN.
ABOVE THE INSTALLATION
HEIGHT
31-14772 Printed in Mexico
Ceiling
House Wiring
Location
C
L
5”
18”
Min.
View from
rear cleats
µ[µPLQ
mounting
support
Centerline of
installation
space
5” c enterline to wall