Instructions / Assembly

Installation Instructions
11
TOOLS AND MATERIALS
REQUIRED
(NOT SUPPLIED)
Pencil and
tape measure
Spirit level
Phillips and
Flat blade screwdrivers
Duct tape
Electric drill with
1/8 and 3/8 bits
1/4 pivoting hex socket
Safety glasses
Flashlight
Saber saw or Key Hole Saw
Tin Snips
Hammer
Pliers
Additional Materials:
• 120V 60Hz. 15 or 20 Amp, 2 wire with ground.
Properly grounded branch circuit.
• Strain relief for junction box.
7” round metal duct, 3-1/4” x 10” rectangular duct
or 3-1/4” x 12” rectangular duct length to suit installation.
Wire Cutter/
Stripper
Ladder
Allen
Wrench
REMOVE THE PACKAGING
• Lift the hood out of the box.
• Remove shipping screws holding the wood mounting
piece to the back side of the hood. Set aside wood
mounting piece and screws for later installation. Do not
discard.
• Remove junction box cover and knockout.
• Install strain relief onto back or top of hood.
• Remove all tape and packing material from the
hood, duct transition and motor.
UL Listed Wire nuts
Remove parts package from the shaped cardboard
insert.
“V”
Remove the shaped carton insert.
“V”
• Remove the small box housing the motor.
Wood
Mounting
Support
Hood
Parts
Package
Shipping Carton
Motor