Owners Manual

CHECK INSTALLATION HARDWARE
Locate the hardware package packed with the hood and check contents.
RECIRCULATING KIT (Included)
11
Installation Preparation
Air deflector
36" HOOD
TEMPLATE
Cut one 1/2" Dia.
Wire Access Hole
as Needed
8-1/4" To
Centerline of
Pilot Holes
8
-1
/
2
"
FRONTOFHOOD
Cut one 1/2" Dia.
Wire AccessHole
as Needed
Cut one 1/2" Dia.
Wire Access Hole
as Needed
Cut one 1/2" Dia.
Wire Access Hole
as Needed
Drill 3/16" Pilot Holes
Approx. 1-1/2" Deep
4 Places
8-1/4" To
Centerline of
Pilot Holes
10-5/16" To
Centerline of
Pilot Holes
10-5/16" To
Centerline of
Pilot Holes
31-14772
Printed in Mexico
12-08 JR
4 Wood
screws
73 Hood attachment screws
(70 required, 3 extra)
Duct covers
Charcoal filter
C
Ceiling support
Horizontal support
Upper vertical supports (4)
Lower vertical supports (4)
Duct cover supports (2)
4 Duct cover clips
Template
Stainless steel filter
D
B
E
A
A
B
C
D
E
HARDWARE PACKAGE
Locate and count screws
Upper
Lower